Set the plant demands
Trees 80 L/day, palms 120, grass 15 L/m². The defaults are ready, and you change them once, in Irrigation Requirements.
Draw the zones and valves
Group the planting into bubbler, drip and sprinkler zones, each on a solenoid valve off the main line.
Size the laterals
One sizing table, with size, maximum flow, colour, layer and line type, drives all three designers.
Run the hydraulics In development
The open-source EPANET engine models the main and every valve’s laterals, one valve at a time or as a whole run set.
Build the schedules
The valve schedule and the irrigation schedule come straight from the design, so they never drift from the drawing.
Issue the BOQ
Pipe lengths, valves, heads, bubblers and emitters, counted from the drawing and ready to price.